Submit a revision to Subdivision Development Engineering Plans
Key points
- Use this option if you have submitted your initial plans, and have been requested by the Engineer to submit updated plans
- How to submit a revision to Subdivision Development Engineering Plans
- What to include with a submission
- When to submit a Subdivision Development Engineering Plan
Plans that can be submitted using this revision submission form
- Stormwater management plans/Detention system plans
- Public lighting plans
- Construction environmental management plans (CEMP)
- Functional layout plans
- Civil detailed design plans
- As constructed plans
Please ensure you submit the following information with your application
- Your planning permit number (i.e. T12345) - This is required with all submissions
- Subdivision number (i.e. S00-000) - This is required with all submissions
- Plans combined in a single PDF
- Any other documentation, as requested by the Engineer
You will be asked to supply a submission number - this relates to whether this the second submission, third submission, fourth submission, etc to Council (this is not the plan revision number).
Submit a revision to Subdivision Development Engineering Plans