Submit a revision to Subdivision Development Engineering Plans

  • Use this option if you have submitted your initial plans, and have been requested by the Engineer to submit updated plans
  • How to submit a revision to Subdivision Development Engineering Plans
  • What to include with a submission 
  • When to submit a Subdivision Development Engineering Plan
  • Stormwater management plans/Detention system plans
  • Public lighting plans
  • Construction environmental management plans (CEMP)
  • Functional layout plans
  • Civil detailed design plans
  • As constructed plans
  • Your planning permit number (i.e. T12345) - This is required with all submissions
  • Subdivision number (i.e. S00-000) - This is required with all submissions
  • Plans combined in a single PDF
  • Any other documentation, as requested by the Engineer

You will be asked to supply a submission number - this relates to whether this the second submission, third submission, fourth submission, etc to Council (this is not the plan revision number). 

Submit a revision to Subdivision Development Engineering Plans