Submit a revision to Stormwater Management Plans

  • Use this option if you have submitted your initial plans, and have been requested by the Engineer to submit updated plans
  • Typical developments that require Stormwater Management Plans
  • How to submit a Stormwater Management Plan
  • Drainage plans, combined in a single PDF 
  • Drainage computations 
  • Water sensitive urban design (WSUD) documentation (if required by permit) 
  • Construction Environmental Management Plans (CEMP) (if required by permit) 

The submission form requests a submission number - this relates to whether this is the second submission, third submission, fourth submission, etc.

Submit a revision to Stormwater Management Plans